Ensure Changes Are Backwards Compatible
Upgrading a smart contract requires careful attention to backward compatibility. Any issues can disrupt operations, cause failures, or even introduce security vulnerabilities in dependent systems. To mitigate these risks, rigorous testing and communication are essential.
Steps to Test Backward Compatibility
1. Understand Dependencies
Map all contracts, dApps, and services interacting with the upgraded contract.
Identify specific methods or storage patterns they rely on.
2. Simulate Interactions
Deploy the upgraded contract on a testnet or local environment.
Point dependent contracts and systems to the upgraded version and test their interactions.
3. Retest Old Interfaces
Validate that all previously exposed public and external functions operate as expected.
Ensure method signatures and expected inputs/outputs remain unchanged unless modifications were explicitly planned and communicated.
4. Validate Storage Layout Compatibility
If using a proxy pattern, confirm that storage layout changes do not disrupt dependent contracts.
Use tools like OpenZeppelin Upgrades to detect storage layout mismatches.
5. Test Common Scenarios
Simulate frequent workflows such as token transfers, staking, or withdrawals.
Verify that these workflows produce the expected outcomes without errors.
6. Run Integration Tests
Conduct integration tests involving all contracts that depend on the upgraded contract.
Include tests for systems relying on third-party libraries or off-chain components.
7. Check Event Consistency
Ensure emitted events maintain the same structure and meaning.
This is crucial for analytics platforms, off-chain indexers, or monitoring tools.
8. Seek Feedback from Stakeholders
Share the upgraded version with integrators and developers using the contract.
Request feedback to identify overlooked dependencies or issues.
9. Audit the Upgrade
Conduct a focused audit of the changes to ensure no new vulnerabilities affect compatibility.
Additional Recommendations
Version Documentation Maintain detailed documentation outlining changes and their potential impact on other systems.
Deprecation Notices Clearly communicate any backward-incompatible changes and provide deprecation notices with alternatives.
Multistage Deployment Roll out upgrades in phases, starting with non-critical systems to monitor for issues before full deployment.
Last updated